Top Ad unit 728 × 90

Libreoffice

Libreoffice Writer

Manufacturing Practical Assignment in Tally

  

AD Computer Campus

MANUFACTURING 

  

Create a Voucher Type 


Gateway of Tally Create Voucher Type➔ Create 


Name : Manufacturing Journal 


Type of Voucher : Stock Journal 


Use as a manufacturing. Voucher : Yes 


Accept 

 

Inventory Master: 


Group: Create 


Raw Material  

Finished Goods 

 

Unit: Create 


Pcs 

  

Stock Item: Create 


F 12: Allow component List Details (Bill of Material) --Yes 

  

Main Item Name (Finished Goods): - Smart Computer Unit: - PCS 

  

  

S.N. 

Item Name 

Rs. 

Opening Stock 

S.N. 

Item 

Name 

Rs.  

Opening Stock 

1 

Monitor 

5000 

15 

6 

Floppy Drive 

1500 

15 

2 

Key Board 

1200 

15 

7 

CD ROM 

2500 

15 

3 

Mouse 

500 

15 

8 

Processor 

8000 

15 

4 

CPU 

5000 

15 

9 

RAM 

2000 

15 

5 

Hard Disk 

4000 

15 

10 

SMPS 

800 

15 

 

Main Item Name (Finished Goods): - TVS Victor Unit: - PCS 


S.N. 

Item Name 

Rs. 

Opening Stock 

S.N. 

Item 

Name 

Rs.  

Opening Stock 

1 

Front Wheel 

6000 

10 

6 

Break Wire 

45 

10 

2 

Back Wheel 

6500 

10 

7 

Clutch Wire 

85 

10 

3 

Hand Lamp 

75 

10 

8 

Side Light 

90 

10 

4 

Break Lamp 

45 

10 

9 

Plug 

45 

10 

5 

Gear Box 

1500 

10 

10 

Bike Body 

10000 

10 

  

Accounting Voucher ➔Alt + F 7➔Select Manufacturing 

 

And Prepared 5 Pcs TVS Victor and 10 Pcs Smart Computer 

 

Display➔ Statement of Inventory➔ Cost Estimation 

 

Manufacturing Practical Assignment in Tally Reviewed by ADcomputercampus on July 28, 2024 Rating: 5

No comments:

Contact Form

Name

Email *

Message *

Powered by Blogger.